Utah Contractor Continuing Education: What Counts, When It's Due, and the 2027 Changes

Utah CE hours for contractors, electricians, plumbers, HVAC, and landscape licenses, the November 30 deadline, and what HB 40 changes on Jan 1, 2027.

Contractor at a shop desk with a laptop showing a blank online course screen and a folder of course certificates, utah contractor continuing education
Utah contractor CE: what counts, when it is due, and what changes January 1, 2027.

Continuing education is the part of a Utah license renewal that's easy to put off until the last week. Then you're hunting for an approved class and a certificate from two years ago.

This guide covers how many hours your license needs, what counts, when it's due, and what changes on January 1, 2027, when HB 40 moves these rules into new sections of Utah law. This is general information, not legal advice. Confirm your requirements with DOPL before your renewal.

The quick recap for contractor licenses

Infographic comparing Utah CE hours per two-year cycle for contractor, electrician, plumber, and elevator mechanic licenses, utah contractor continuing education
CE hours per two-year cycle by license type, from DOPL and Utah Code.

If you hold a Utah contractor license, DOPL's rule is short. Complete 6 hours of approved CE per licensing period. Three hours must be "core." The other three can be core or "professional." A maximum of 3 hours may be completed online [1].

We covered the rest of the renewal (insurance, workers' comp, and the financial questions) in our license renewal checklist. This post sticks to CE.

Trade licenses need more hours

Electricians and plumbers have their own totals, and they're bigger. Under current Utah law, per two-year cycle [3]:

License CE hours per two-year cycle
Contractor 6 [1]
Electrician 16 [3]
Plumber 12 [3]
Elevator mechanic 8 [3]

One caution: the 3-hour online cap above is DOPL's rule for contractor CE [1]. We didn't confirm the online limits for electricians and plumbers, so don't assume the contractor cap applies to them. Check with DOPL before you sign up for a fully online package.

Specialty rules for HVAC and landscape licenses

Some specialty licenses have to spend part of their 6 hours on their own trade:

  • HVAC: at least three of the six hours must relate to HVAC work [2].
  • Landscape: landscape specialty licensees take 1 hour on water conservation or fire risk [2].
  • Energy conservation: the current statute also provides for an optional hour on energy conservation [2].

If you hold more than one license, check each one. The hours don't always overlap the way you'd hope.

What counts: approved providers only

CE only counts if the course and provider are approved for Utah contractor CE [1][2]. A good class from an unapproved provider is still zero hours on your renewal.

Before you pay for anything:

  1. Check DOPL's continuing education page for the approved list [1].
  2. Confirm whether the course is core or professional.
  3. Confirm whether it's online, so you don't go over the online limit.
  4. Save the certificate the day you finish.

If you're unsure, DOPL's phone number is (801) 530-6628 [1].

When it's due

Utah contractor licenses expire November 30 of odd-numbered years [5]. By our count, that makes the next standard expiration November 30, 2027 (a date we derived from DOPL's rule, not one DOPL lists by itself) [5].

That sounds far off. It isn't, if you plan to take classes in the slow months. Winter is a good time to knock out hours, and next winter is the last one before that deadline.

What changes on January 1, 2027 (HB 40)

Infographic showing Utah contractor CE rules moving from current code sections to new sections on January 1, 2027 under HB 40, utah contractor continuing education
HB 40 moves the CE rules to new sections on January 1, 2027; the hour totals stay the same.

HB 40, passed in 2026, takes effect on January 1, 2027 [4]. It repeals the two sections cited above, Utah Code 58-55-302.5 and 58-55-302.7, on that date [2][3] and moves the CE rules into new sections:

  • New 58-55-204: contractor CE stays at six hours, and the HVAC rule of 3 of the 6 hours is kept [4].
  • New 58-55-304 and 58-55-405: electricians stay at 16 hours and plumbers at 12 [4].
  • New 58-55-507: elevator mechanics [4].
  • More approved providers: the list widens to include state agencies, workers' comp carriers, and in-state colleges [4].
  • License terms: the term stays two years, set by rule, but "the division may extend or shorten a license term by up to one year to stagger renewals" [4]. Renewal still requires that the qualifier completed CE under the new 58-55-204 [4].

DOPL hasn't published how it will stagger renewals. It may move some expiration dates. Watch DOPL's site and your license record, and don't assume your date until DOPL tells you.

What doesn't change

The hour totals. Six for contractors, 16 for electricians, 12 for plumbers [4]. If you've been planning around those numbers, keep planning.

If you're reading an older article (including ours) that cites 58-55-302.5 or 302.7, it's correct until December 31, 2026. After that, look for the new section numbers.

Example: a CE plan for a small shop

Example scenario, with made-up names and example numbers for illustration. A three-person landscape and irrigation company in Utah County has one qualifier on a landscape specialty license. The owner sets up a one-page CE plan in November 2026:

Item Plan
Hours needed this cycle 6
Core hours 3, in person in January
Water conservation or fire risk 1, the required landscape hour
Professional hours 2, online
Online hours used 2 of the 3 allowed
Certificates Saved to one folder named by license and cycle

The owner also blocks out two Friday afternoons in January. At an example loaded rate of $45 an hour for the owner's time, 6 hours of class is $270 of time that isn't going to a job. That's a real cost of keeping the license, and it belongs in overhead, not in a guess.

Keep certificates by license and cycle

The fastest renewal is the one where every certificate is already in one place. Make a folder per license, then a subfolder per cycle (for example, "2025-2027"). Drop each certificate in the day you finish. When renewal opens, you're done in minutes.

How WeBuilt helps

CE keeps your license current. Profit per job keeps the business worth licensing. WeBuilt doesn't track licenses or CE hours. What it does is keep your customers, estimates, and jobs together, and show revenue, cost, and margin for each job as you record costs against it. When you're sitting in a January class wondering if the work is paying, you can open WeBuilt and see which jobs made money last season and which ones didn't. That's the number that tells you whether to raise prices, change the kind of work you chase, or keep doing what's working. See what's included today.

FAQ

How many CE hours does a Utah contractor need?

Six hours per licensing period, with at least 3 core and a maximum of 3 online [1]. Electricians need 16 and plumbers need 12 per two-year cycle [3].

When do Utah contractor licenses expire?

November 30 of odd-numbered years [5]. Under HB 40, DOPL may extend or shorten a license term by up to one year to stagger renewals, so watch for changes [4].

Does HB 40 change the number of CE hours?

No. It moves the rules into new code sections and widens the provider list, but the totals stay the same [4].

Want a quick look?

Book a 15-minute walkthrough with Ian and bring a job you finished this year. We'll show you how WeBuilt shows what it actually made.

Sources

  1. Utah Division of Professional Licensing (DOPL), Contracting Continuing Education. Accessed November 2, 2026.
  2. Utah Code 58-55-302.5, Continuing education requirements for contractor licensees (version effective 5/6/2026; repealed 1/1/2027). Accessed November 2, 2026.
  3. Utah Code 58-55-302.7, Continuing education requirements for electrical, plumbing, and elevator licensees (repealed 1/1/2027). Accessed November 2, 2026.
  4. Utah Legislature, HB 40 (2026), Utah Construction Trades Licensing Act Amendments, enrolled (Laws of Utah 2026, Chapter 42). Accessed November 2, 2026.
  5. Utah DOPL, Contracting Frequently Asked Questions. Accessed November 2, 2026.